Skip to content

CI: check the XML structure of the PR head, not of the merge commit - #791

Merged
alfsb merged 1 commit into
php:masterfrom
lacatoire:ci/check-xml-pr-head
Aug 7, 2026
Merged

CI: check the XML structure of the PR head, not of the merge commit#791
alfsb merged 1 commit into
php:masterfrom
lacatoire:ci/check-xml-pr-head

CI: check the XML structure of the PR head, not of the merge commit

6c4cf65
Select commit
Loading
Failed to load commit list.
Sign in for the full log view

Annotations

1 warning
Build
succeeded Aug 7, 2026 in 27s