chore(deps) Update dependency glob to v8 - #920
Open
renovate[bot] wants to merge 1 commit into
Open
Azure Pipelines / commitizen.cz-cli (Linux node-20)
cancelled
Sep 4, 2026 in 1h 0m 23s
Linux node-20 was canceled
Annotations
Check failure on line 193 in Build log
azure-pipelines / commitizen.cz-cli (Linux node-20)
Build log #L193
The Operation will be canceled. The next steps may not contain expected logs.
Check failure on line 198 in Build log
azure-pipelines / commitizen.cz-cli (Linux node-20)
Build log #L198
The operation was canceled.
Loading