The experiment's edge-folding device is experiment E1, PneumaticCircuits.Experiments.TwoHandPress,
built as in the guideline's circuit diagram. This page says where each task can be done in
simulation; it gives no answers to the report questions.
Before the lab: install OpenModelica (install) and work through lessons L01 to L05
(learn): they build the edge-folding circuit up from one cylinder, one idea at a time.
Then open Experiments.TwoHandPress, simulate it, and watch it in the Diagram Window.
| Guideline task | In this repository |
|---|---|
| 1. Understand the device and the circuit | circuit diagram, how it works, components |
| 2. Assemble the circuit | open TwoHandPress in OMEdit (software); every part and tube is a block you can move, inspect and re-connect |
| 3. Two-hand actuation | runs E1-01 to E1-05: both buttons, each alone, one released mid-stroke, one pressed late |
| 4. Extension and retraction times against 1V3 | runs E1-T: eight throttle settings, stroke times in results/tables/E1.csv |
| 5. The valve that combines the two buttons | runs E1-02, E1-03 (one button), the pilot pressure of 1V2 in the E1-01 figure |
| 6. 1V4 | runs E1-N: the same circuit without it |
| 7. Pressures at 1Z1 and 1Z2 | every E1 run records both gauges; extended, returning and at rest in E1.csv |
| 8. A delay by closing 1V3 | runs E1-T down to 2.5 % |
| 9. One button alone | runs E1-02, E1-03 |
| 10. Summary | results |
Component names. The guideline's component list names 1V1 to 1V4 generically ("directional, shuttle, flow control, check"). The circuit diagram shows 1V1 as a two-pressure (AND) valve, 1V2 as a pilot-operated 5/2-way valve with spring return, 1V3 as a one-way flow control valve and 1V4 as a quick-exhaust valve. The simulation follows the diagram.
Two more experiments with the same kit, beyond the guideline: E2, automatic reciprocation with roller limit valves (meter-in against meter-out), and E3, a pressure-dependent return with a pressure sequence valve.
On the real kit. Supply at most 6 bar through the service unit; push tubes fully home and tug-test them; vent the circuit before changing tubing; keep hands out of the cylinder's path; wear eye protection while air lines are being connected.