Scaffolding for a SAFe x AI-DLC program -- an initiative decomposed into Units of Work and sequenced into Bolts. Replace every bracketed placeholder. Delete guidance blockquotes before committing. Method reference: SAFe x AI-DLC Methodology.
| Field | Value |
|---|---|
| Initiative | [{{TICKET_PREFIX}}-XXX / initiative URL] |
| Source | [audit or epic that triggered this] |
| Method | SAFe x AI-DLC |
| Owner (HITL) | [role or name] |
| Date | [YYYY-MM-DD] |
| Status | [Proposed / Active / Complete] |
One or two paragraphs. State the problem in terms a reader outside the team would understand, and name the single finding that justifies the whole program. Be concrete -- "a green CI run currently means nothing" beats "quality needs improvement."
[Problem statement.]
Program outcome: [The one sentence that describes done.]
Each project is one coherent outcome, not a grab-bag. Lead role must be an existing
agent:*label.
| Project | Outcome | Issues | Bolt | Lead role |
|---|---|---|---|---|
| P1 [Name] | [What is true when this is done] | [IDs] | bolt:N |
agent:* |
| P2 [Name] | ||||
| P3 [Name] |
Streams: [If the tracker plan supports sub-initiatives, name them. Otherwise state how project priority encodes the streams -- e.g. Urgent/High = highest-risk stream, Medium = follow-up.]
One row per issue. WSJF drives ordering within a Bolt; MoSCoW records negotiability.
| ID | Ticket | Title | Project | Bolt | Phase | WSJF | MoSCoW | Status |
|---|---|---|---|---|---|---|---|---|
| [ID] | {{TICKET_PREFIX}}-XXX | bolt:N |
Inception | Must |
A Bolt exits on evidence, not on a date. Entry and exit criteria are mandatory -- a Bolt with vague exit criteria will not close cleanly.
| Bolt | Name | Duration | Issues (in order) | Entry criteria | Exit criteria |
|---|---|---|---|---|---|
| 0 | [Containment] | Hours | [What must be true to start] | [What proves it is done] | |
| 1 | [Name] | 2-3 days | Bolt 0 complete | ||
| 2 | [Name] | 2-3 days |
A Bolt is a short swarm, not a solo assignment. The lead role opens each issue, runs Mob Elaboration
into sub-issues, and pauses for the human to validate business context before Mob Construction
begins. A Bolt exits only when its issues are merged to {{MAIN_BRANCH}}, the relevant gates
are real and green, and evidence is posted to the tracker. A green check that still masks a
failure is not an exit.
Wire so the enforcement lands before the thing it enforces: fix the gate before the fix it verifies; rotate before scrub; capture before alert; upgrades before re-baseline.
graph LR
A[ID-01 keystone] --> B[ID-02]
A --> C[ID-03]
B --> D[ID-04]
Critical path: [Name the keystone issue and explain why it gates the rest.]
Soft links (relatedTo, not blocking): [list]
Which issues need real elaboration before anyone writes code, and which are ready to build.
- Inception-heavy (unknowns to resolve, decisions to route): [IDs]
- Construction-ready (elaborated, unblocked): [IDs]
- Operations (deploy, schedule, run): [IDs]
An issue may appear in two phases -- e.g. a policy decision in Inception and the scheduled job that enforces it in Operations. Note those explicitly.
| Concern | Responsible | Accountable | Consulted | Informed |
|---|---|---|---|---|
| [Unit of Work] | agent:* |
agent:rte |
[role] | Team |
| Business-context decisions | HITL | HITL | Lead role | Team |
| Final merge (HITL) | HITL | HITL | agent:rte |
Team |
Agents lead the build; the human owns the judgment.
Every issue in this program is done only when all four hold:
- Code is merged to
{{MAIN_BRANCH}}via rebase-and-merge with atype(scope): description [{{TICKET_PREFIX}}-XXX]commit. - The relevant gate is now real and green -- it enforces the thing it claims, with no masking.
- Evidence is posted to the tracker (dev/staging/done as applicable).
- No silent suppressions were added: no new error-swallowing, no broadened ignore globs, no non-blocking downgrade of a check that should block.
Decisions the agents must never make alone. Surface options with a recommendation, then stop.
- Approve the program structure and naming
- [Any credential rotation or production action -- owned by the human]
- Set Bolt target dates
- [Fix-versus-suppress budget, if applicable]
- [Security policy decisions: CSP allow-list, auth behavior, headers]
- [Which CI checks become required]
- [Dependency severity policy]
- [Any SOP exception]
- Sign the Definition of Done and accept each Bolt's evidence
| Date | Change | Author |
|---|---|---|
| [YYYY-MM-DD] | Program created | [role] |